Installation of Trunking
Installation of Trunking
Points : Installation of Trunking, Materials of Trunking, Common Sizes of Trunking
The installation layout must be planned before starting to work. If the installation is in a new or
altered building, all internal structural and wall finishes should have been completed. The trunking
should be cut using a fine tooth saw. Clean off any bums or swarf after making the cut. The main
component of the trunking is generally fitted to the surface of the wall by using screws. It is advise-
able to use Washers under the screw heads. Trunking should be fixed at intervals of not more 5 00mm and
there should also be fixings within about 100mm. of the end. Once the trunking has been fixed, the
cables can be run. Where there are vertical runs of trunking pin racks should be fitted inside the
trunking to support the cables. These pin racks consist. of steel pins, sheathed by an insulating
material mounted on a back late of the trunking, made the earth continuity between’ sections of
trunking. In case of non-metallic trunking, it is advisable to run an insulated conductor for earthing
purpose.
Materials of Trunking
(i) Tees
(ii) Bends
(iii) Flanges
(iv) Reducer channels
(v) Elbows
(vi) Connectors
(vii) Couplers
(viii) Trunking
(ix) Screws
(x) Washers
Common Sizes of Trunking
1.5 x 1.5
2 x 1.5
3 x 1.5
3 x 2
4 x 1.5
4 x 2
3 x 3
6 x 1.5
4 x 3
6 x 2
6 x 3
6 x 4
6 x 6
9 x 4