- In bath rooms, all non-electrical metal work including must be bonded together and earthed.
(a) Bath tubs
(b) Water pipes
(c) Sinks
(d) All of above - Do not exceed per circuit
(a) 800 watts
(b) 10 lights or fans
(c) 15 lights
(d) All of above - Do not exceed per circuit - numbers of plug points for power circuit.
(a) 2
(b) 3
(c) 4
(d) 1 - Use heavily insulated, flexible cables for _______ appliances.
(a) Domestic & Commercial
(b) Industrial
(c) Commercial
(d) Domestic - Do not keep pump motors exposed to open atmosphere, provide
(a) Weather proof covers
(b) Tarpaulin
(c) Cover
(d) Canvas - Provide lighting arresters, for High Rise Buildings having IR values
(a) Must be 10 M?
(b) Mast be 15 M?
(c) Must be 5 M?
(d) Must be 1 M? - Provide Earth Leakage Circuit breakers, for loads exceeding
(a) 15 K Watts
(b) 25 K Watts
(c) 05 K Watts
(d) 0.5 K Watt - If Generators are used, connect them in a standard way and ensure that it is not _____ with EB supply.
(a) Paralleled
(b) Series
(c) Compounded
(d) None of above - Overhead charges will generally he assumed as ______ of the total cost.
(a) 1%to2.5%
(b) 10%to25%
(c) 20%to25%
(d) 15%to25% - Tool charges are usually _______ of the total cost.
(a) 13 to 15%
(b) 10 to 15%
(c) 5 to 10%
(d) 3 to 5% - Wiring of All multi-storied buildings above 15.0 M Height must be inspected by electrical Inspector and he/she has to approve.
(a) Rule 60 A
(b) Rule 50 A
(c) Rule 70 A
(d) None of above - Any wiring system has to Past for
(a) 10 years
(b) 12 years
(c) 15 years
(d) 25 years - In wiring system ____quality materials are to be used.
(a) High
(b) Medium
(c) Low
(d) Super - High _____workmanship must be executed so materials cost and labour charges will be high.
(a) Quality
(b) Rise
(c) Tension
(d) None of above - For loads above, _______ single phase supply must be arranged.
(a) 15KW
(b) 10KW
(c) 5KW
(d) 4KW - The wiring should be done very close to the
(a) Walls
(b) Ceiling
(c) Floor
(d) Slab - For final sub-circuits, use 1 sq. mm of copper or ___Aluminium for earth conductor,
(a) sq.mm
(b) sq.mm
(c) sq. mm
(d) sq. mm - The bottom of ceiling fan should have a mm. clearance of
(a) 3m
(b) 4m.
(c) 3.5 m
(d) 2.7m. - The consumer should provide ONE earth electrode for single and for three supplies.
(a) Three
(b) Two
(c) Four
(d) None - If than one electrode is provide, all earth electrodes must be linked for combined ______ resistance.
(a) Low
(b) High
(c) Medium
(d) None of above - Use a minimum of______ (Tinned- Copper) for earth leads.
(a) 10 SWG TC
(b) I2SWGTC
(c) 16 SWG TC
(d) 14 SWG TC - All non-current carrying metallic parts must be provided with _____separate and distinct earth wires.
(a) 4
(b) 3
(c) 2
(d) None of above - Allow 10% of total conduit length for wastage in any system.
(a) 2%
(b) 3%
(c) 15%
(d) 10% - The length of wire can be taken as ______________the length of conduit for looping system and 2 times for junction box system.
(a) times
(b) 2.0 times
(c) 2.5 times
(d) 3.5 times - The length of the looping wire etc. in switch boxes shall not be lesser than _____of the height of the box itself.
(a) times
(b) time
(c) 0.5 times
(d) 0.25 times
Pages
▼
Wednesday, 7 December 2016
Estimation of Electrical Wiring Multi Choice Questions & Answers
Estimation of Electrical Wiring Multi Choice Questions & Answers
Points : estimation of electrical wiring multi choice questions and answers, estimation of electrical wiring mcqs, objective
Multi Choice Questions & Answers
No comments:
Post a Comment